Penetration collars fixed through the mesh before concreting

Inner South & City Fringe · AS 3660.1

Pre-Construction Termite Barriers Zetland

Barrier work in Zetland 2017, the Green Square town centre suburb where medium and high density slabs rise on former racecourse, factory and naval store land.

Postcode2017
DistrictInner South & City Fringe
From the CBD4.4 km south
CouncilSydney CBD Council

Quick answer

New buildings at Zetland containing termite-susceptible elements need a management system under the NCC, installed to AS 3660.1. Collars are fitted to every slab penetration before the pour and the perimeter follows. City of Sydney certifiers require the installation certificate and durable notice before the Occupation Certificate.

Termite barriers in Zetland

Why Zetland builds need the barrier in before the pour

Zetland sits about 4.4 km south of the city in the City of Sydney, its name taken from Zetland Lodge, a stable established in 1874. The land later held Victoria Park racecourse, a vehicle assembly factory between 1950 and 1975, and a Naval Stores depot until the mid-1990s. Today it forms part of the Green Square Town Centre, with medium and high density apartments, Green Square Plaza, retail along Ebsworth Street and the Gunyama Park aquatic centre, so construction here is overwhelmingly multi-dwelling.

Industrial history and dense development set the conditions. Ground that has carried a racecourse, a factory and a naval depot is made ground in places, with fill and buried material below the surface, and the low-lying southern city fringe holds moisture. On an apartment slab, the risk concentrates in the sheer number of hydraulic and service penetrations, each one a route unless it is collared before the concrete goes down. Edge protection and joint detailing complete the picture on these podium slabs.

Reviewed by Ismail, founder · Inner South & City Fringe coverage · Updated September 2026 · More Inner South & City Fringe suburbs

Get my fixed quote
Pipe penetrations sealed into the termite barrier membrane
Pipe penetrations sealed into the termite barrier membrane — one of our own Inner South & City Fringe installations.

Local conditions

What makes Zetland blocks a termite risk

Three Zetland conditions drive barrier planning.

High penetration counts

Apartment and podium slabs carry dozens of hydraulic and service penetrations. Collaring is the bulk of the work and has to be coordinated with the hydraulic trade in one pass before the pour.

Made ground and fill

Former racecourse, factory and depot land often means fill and buried material beneath new slabs, which changes what the under-slab component has to deal with.

Low-lying city fringe

Ground here sits low and holds moisture, and damp soil against a slab edge keeps foraging pressure up even in a dense urban setting.

What we install here

Building in Zetland

Zetland work is dominated by apartment and podium slabs, with occasional townhouse and mixed-use developments. We work from the hydraulic set-out, collar every penetration in a single coordinated pass, install the under-slab component specified for the design and complete the perimeter as the structure rises. Documentation is prepared so it can be matched to the development approval for the whole building. Everything is priced as one fixed quote with stages listed against the construction program.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Zetland

Sites sit within a short walk of Nuffield Park, about a hundred metres from the centre, with Green Square station less than a kilometre away and The Australian Golf Club a little beyond it. The dense Green Square precinct means most work is multi-dwelling, so the program is set by the main contractor and the hydraulic trade rather than by the weather or the size of a single footprint.

The City of Sydney certifies development at Zetland, and Green Square projects are usually large enough to involve a private certifier working to that approval. Either way, the evidence required before the Occupation Certificate is the same: a certificate identifying products, protected areas and the licensed installer, plus a durable notice fixed permanently in the building's meter box or services area with the inspection recommendation.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Zetland at a glance

Termite barrier facts for Zetland

SuburbZetland, NSW 2017
DistrictInner South & City Fringe
Distance from Sydney CBD4.4 km south
Certifying councilSydney CBD Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Zetland questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Do apartment buildings in Zetland really need termite barriers?

Where a building includes primary elements that termites can damage, the NCC requirement applies regardless of how many storeys sit above. In practice the work concentrates at slab level, collaring every hydraulic and service penetration and protecting the edge, which is exactly where concealed entry would otherwise occur.

The site was a factory and depot. Does history matter?

It affects what is under the slab. Made ground and fill from earlier uses can contain buried material and behave differently to natural soil, so the under-slab component and the way the edge is finished are chosen with that in mind rather than assuming clean, undisturbed ground.

How do you fit into a large construction program?

By working to the hydraulic contractor's set-out and completing the collar stage in one pass ahead of the pour inspection, with the perimeter finished as the structure rises. Dates are locked with the main contractor in advance, and the documentation is issued so the certifier can match it to the approval for the whole development.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Zetland

Same crew, same staging and the same certifier-ready paperwork, right across the Inner South & City Fringe.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site