Multi-dwelling penetration counts
Townhouse rows and podium slabs put dozens of services through a single pour, so collar numbers and coordination with the hydraulic trade set the program, not the floor area.

15 suburbs covered
Barrier work across 15 Parramatta and central west suburbs, from Westmead and Northmead townhouses to Merrylands and Granville dual occupancies near the river flats.
Quick answer
New dwellings around Parramatta and the central west need a termite management system under the NCC, installed to AS 3660.1. Collars and under-slab protection precede the pour. City of Parramatta or Cumberland certifiers need the installation certificate and durable notice before the Occupation Certificate.
Barriers across the Parramatta & Central West
Parramatta and the central west covers 15 suburbs on this site, from Parramatta, North Parramatta and Westmead through Northmead, Winston Hills and Toongabbie to Merrylands, Guildford and Yennora. It is a district of density: townhouse rows, dual occupancies, granny flats and apartment podiums are the everyday jobs, with detached rebuilds on the deeper blocks further from the centre.
The Parramatta River and its tributaries shape the ground. River flats hold moisture and organic material, and older suburbs carry decades of garden soil beneath a fresh pad. Density is the other factor: a townhouse row or podium slab runs a large number of services through one pour, and every penetration is a route unless it is sealed first. As always, a slab is tested at its penetrations, its edge and its joints, and those close before the concrete arrives.
Get my fixed quote
Local conditions
Three conditions shape barrier work around Parramatta.
Townhouse rows and podium slabs put dozens of services through a single pour, so collar numbers and coordination with the hydraulic trade set the program, not the floor area.
The Parramatta River and its tributaries keep soil damp along the flats, and moisture against a slab edge raises foraging pressure on blocks near those corridors.
Dual occupancy sites carry decades of garden material under the new pad, which can support a colony before construction begins, so the under-slab component matters.
What we install here
Work here is townhouse rows, dual occupancies, granny flats, apartment podiums and detached rebuilds. We collar every penetration, install the under-slab component the design specifies, and complete perimeter and cavity protection as the structure rises. Multi-dwelling sites receive documentation per dwelling so each can be certified and sold separately. Everything is quoted as one fixed price with stages itemised against the builder's program.
Councils & certifiers
The City of Parramatta certifies the central suburbs, with Cumberland City Council covering Merrylands, Guildford and the southern edge, and boundaries running through parts of the district. We confirm which authority holds your approval when quoting, since that certifier receives the installation certificate and the durable notice ahead of the Occupation Certificate.
Our run covers the Parramatta CBD fringe and Westmead's hospital precinct, the residential belt through Northmead, North Rocks and Winston Hills, and the southern suburbs at Merrylands, Guildford, Granville and Yennora. Blocks near the river flats and creek corridors get the most careful perimeter detailing, while the multi-dwelling sites are driven by penetration counts and program.
Parramatta & Central West
Every suburb has its own page with the local ground conditions, the councils that certify there and the questions builders ask us most.
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Parramatta & Central West questions
Can't see your question? Call and talk it through with a licensed technician.
+61 450 515 215On penetration count and staging rather than floor area. A row puts several sets of plumbing and conduit through one slab, so collaring is the bulk of the work. Each dwelling still receives its own documentation so the certifier can match the system to the approval and each home can be sold with a complete record.
Either the City of Parramatta or Cumberland City Council, depending on the address, and the boundary runs through parts of the district. We confirm it against your property when quoting so the certificate and durable notice suit your approval. The standard applied is AS 3660.1 in both cases.
It raises the emphasis on the perimeter. Flat, moisture-holding ground near the river and its creeks keeps foraging pressure up against the slab, so the treated or shielded edge runs continuously and we flag where planned paving or fill could bury the inspection strip after handover.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
