Boundary-to-boundary terraces
Terrace blocks leave almost no side clearance, restricting the width of a treated zone and the machinery that can reach the pad, so collars and edge detail carry the system.

51 suburbs covered
Barrier work across 51 Inner West suburbs, from Newtown and Marrickville terrace additions to full rebuilds in Ashfield, Concord, Five Dock and Strathfield.
Quick answer
New slabs and dwellings across the Inner West need a termite management system under the NCC, installed to AS 3660.1. Collars and under-slab protection go in before the pour, and the certifier for your council needs the installation certificate and durable notice before issuing the Occupation Certificate.
Barriers across the Inner West
The Inner West covers 51 suburbs on this site, the largest district on the map, running from Newtown, Enmore and Erskineville through Marrickville, Dulwich Hill and Ashfield out to Concord, Five Dock, Strathfield and the bays. Almost all building here is infill: rear additions to terraces and bungalows, granny flats on deep back gardens, full rebuilds behind retained facades, and small townhouse or apartment developments near the stations.
These are some of the oldest residential blocks in Sydney, and the soil shows it. A century of gardens, old drainage runs, buried brick and timber all sit beneath a new pad, and deep rear yards keep damp, shaded ground against the building line. Add canal and river margins at Hawthorne Canal and the Cooks River, and moisture is rarely far away. A slab is tested at the penetrations, the edge and the joints, so the barrier has to be planned from the drawings and installed before the concrete.
Get my fixed quote
Local conditions
Three conditions shape barrier work across the Inner West.
Terrace blocks leave almost no side clearance, restricting the width of a treated zone and the machinery that can reach the pad, so collars and edge detail carry the system.
A century of gardens, old sewer runs and buried material sits under new slabs here, and that organic content can support a colony well before construction starts.
Rear additions join fresh concrete to retained brickwork. That interface is the most common weak point on an addition, so it is detailed deliberately rather than left to the day.
What we install here
Inner West work is rear additions, granny flats, rebuilds behind retained frontages and small multi-dwelling slabs. We collar every penetration, install the under-slab component the design calls for, and complete perimeter and cavity protection as the structure rises, paying particular attention where new work meets existing walls. Access on terrace sites is planned with the builder in advance, and each stage is priced in one fixed written quote.
Councils & certifiers
Inner West Council certifies most of the district, with Burwood, Strathfield and Canada Bay covering the western suburbs and the City of Sydney taking in the eastern fringe. Conservation area controls are common and affect appearance rather than the termite requirement. The certifier still needs the certificate of installation and the durable notice in the meter box before the Occupation Certificate.
Our Inner West run covers the terrace belt at Newtown, Enmore, Erskineville and Stanmore, the Marrickville and Dulwich Hill corridor near the Cooks River, the Ashfield, Summer Hill and Haberfield heritage streets, and the bayside suburbs at Drummoyne, Five Dock, Abbotsford and Rodd Point. Blocks near the canal and river margins sit on damper ground and get closer attention at the edge.
Inner West
Every suburb has its own page with the local ground conditions, the councils that certify there and the questions builders ask us most.
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Inner West questions
Can't see your question? Call and talk it through with a licensed technician.
+61 450 515 215If the addition includes a new slab or new primary building elements that termites can damage, then yes, and the certifier will expect documentation covering that work. We quote the new portion and detail the junction where fresh concrete meets the retained structure, since that interface is where additions are most often left exposed.
Conservation controls govern what the building looks like from the street, not what sits under the slab, so a compliant system is still installed to AS 3660.1. What can change is access and how much disturbance is acceptable around retained fabric, which we work through with your builder and certifier before the pour.
Yes, and it is treated as its own structure: its own collars, its own edge treatment and its own certificate and durable notice. Deep rear yards here often hold decades of buried garden material, so the under-slab component matters, and access is usually the item to plan first with your builder.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
