Penetration collars fixed through the mesh before concreting

Eastern Suburbs · AS 3660.1

Pre-Construction Termite Barriers Bellevue Hill

A century-old brick house can sit next door to a brand new concrete rebuild on the same Bellevue Hill street, postcode 2023, and the new slab still needs its termite barrier signed off by Woollahra's certifier.

Postcode2023
DistrictEastern Suburbs
From the CBD4.4 km east
CouncilSydney CBD Council

Quick answer

Yes. Bellevue Hill sits within the Municipality of Woollahra in a termite-prone part of Sydney, so any new slab, whether a full knockdown rebuild or a rear extension, needs a compliant termite management system under the National Construction Code. Collars go in ahead of the pour, satisfying the AS 3660.1 standard, with the notice and certificate ready for Woollahra's certifier.

Termite barriers in Bellevue Hill

Why Bellevue Hill builds need the barrier in before the pour

Bellevue Hill sits on a ridge about 4.4 km east of the Sydney CBD, in postcode 2023 and the Municipality of Woollahra. Much of the suburb was built between about 1910 and 1930 after the tram line opened the area up, and it still holds substantial houses on big blocks, several heritage-listed mansions and the grounds of Cranbrook School and The Scots College. Many older homes have since been rebuilt or extended, so a single street can hold a century-old brick house beside a newer concrete one, and that pattern of ongoing knockdown rebuilds and major extensions is the main source of new termite management work in the suburb today.

That range in housing age matters for how a barrier gets detailed. Older houses often keep timber floors, deep roof spaces and mature gardens with mulched beds, all conditions that suit termites as well as spiders and rats, and a rebuild on one of these blocks is starting from ground that has had a century to accumulate old timber and planting. Newer rebuilds tend to have slab edges, landscaped retaining walls and irrigation systems that termites can exploit if moisture is allowed to sit against the building, so the barrier and the landscaping plan need to be considered together rather than as separate jobs. The bushy gully of Cooper Park adds possums and spiders to streets nearby, though it is the mature, established gardens that most shape termite risk here.

Reviewed by Ismail, founder · Eastern Suburbs coverage · Updated September 2026 · More Eastern Suburbs suburbs

Get my fixed quote
Pipe penetrations sealed into the termite barrier membrane
Pipe penetrations sealed into the termite barrier membrane — one of our own Eastern Suburbs installations.

Local conditions

What makes Bellevue Hill blocks a termite risk

Bellevue Hill's mix of century-old homes and fresh rebuilds creates its own particular set of risks.

A century of established gardens

Blocks that have carried the same substantial house for a hundred years often have deep, mulched garden beds and mature trees close to the walls, conditions with decades to develop termite activity nearby. A knockdown rebuild on one of these sites needs soil preparation that accounts for that history, not just a new slab poured over it.

Irrigation against new slab edges

Newer Bellevue Hill rebuilds often come with landscaped retaining walls and automated irrigation close to the building, and if that watering keeps soil against the slab edge consistently damp, it gives termites exactly the moisture they need. We plan barrier and drainage details together with the landscaping rather than treating them separately.

Cooper Park's bushy gully

The gully running through Cooper Park brings possums and spiders into streets nearby, and while that is a different pest picture to termite activity, it points to how much shaded, damp ground sits close to some Bellevue Hill blocks. We take that into account on any barrier detailed near the park.

What we install here

Building in Bellevue Hill

Most Bellevue Hill work is full knockdown rebuilds and major extensions on established blocks, ranging from heritage-adjacent renovations to entirely new houses replacing older stock. Slabs here often tie into retaining walls, terraced gardens and irrigation systems installed as part of the landscaping, so we detail collars and perimeter protection around those features rather than assuming an open, flat site. We work to the builder's program, booking our visit for the window after the plumbing rough-in and before the pour, and return for later stages where a project is delivered in separate approvals.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Bellevue Hill

March Street Reserve sits close to the older streets, its lawns and watered gardens a reminder of how much irrigation and shaded ground already exists around established Bellevue Hill blocks. Woollahra Golf Club keeps a large area of turf watered nearby, adding to that moisture across the wider neighbourhood. Westfield Bondi Junction, a similar distance away, is a major food retail centre, and while its influence is more about general pest activity than termites specifically, it marks how close Bellevue Hill sits to one of the busiest parts of the eastern suburbs.

Bellevue Hill is certified through the Municipality of Woollahra, and two documents need to be ready for the certifier: a durable notice mounted inside the meter box, and an installation certificate that records the products used, the areas covered and who carried out the work. Heritage-adjacent rebuilds and major extensions get the same paperwork as a straightforward new build, and both documents are ready the moment our stage of the job wraps up.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Bellevue Hill at a glance

Termite barrier facts for Bellevue Hill

SuburbBellevue Hill, NSW 2023
DistrictEastern Suburbs
Distance from Sydney CBD4.4 km east
Certifying councilSydney CBD Council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Bellevue Hill questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Does a heritage-adjacent rebuild in Bellevue Hill need special termite treatment?

The termite management requirement itself does not change because a building sits near heritage stock, but the site preparation often does. Rebuilds on blocks with a century of established gardens tend to have more old timber and planting in the soil, so we pay closer attention to that history before recommending a system, even though the barrier is still installed to the same AS 3660.1 standard.

Can irrigation near a new slab in Bellevue Hill cause termite problems?

It can, if watering keeps soil against the slab edge consistently damp, since that moisture is exactly what termite activity favours. We plan barrier details and drainage together with the landscaping design where possible, and can advise on keeping irrigation lines clear of the slab edge so the barrier is not working against constant dampness.

Do we need a new barrier if we are extending rather than fully rebuilding?

Yes, any new footing or slab, including a rear or side extension, needs its own compliant termite management system under the National Construction Code, even if the rest of the house predates any such requirement. We tie the new barrier into the existing structure where the detailing allows, and the extension still needs its own durable notice and certificate for the Woollahra certifier.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Bellevue Hill

Same crew, same staging and the same certifier-ready paperwork, right across the Eastern Suburbs.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site