River and reserve boundaries
Blackman Park follows the river and smaller reserves sit between the streets, keeping timber and damp ground close to residential blocks, so perimeters run the full slab rather than selected faces.

Lower North Shore · AS 3660.1
Pre-construction barriers in Lane Cove West 2066, from riverside family homes near Blackman Park to factory and warehouse slabs in the Mars Road business park.
Quick answer
A new dwelling at Lane Cove West needs a termite management system under the NCC, installed to AS 3660.1. Collars and the under-slab component go in before the pour and the perimeter is completed during the build. Lane Cove Council certifiers require the installation certificate and durable notice before the Occupation Certificate.
Termite barriers in Lane Cove West
Lane Cove West lies about 8 km north-west of the city in the Lane Cove Council area. Its residential streets are mainly single-family homes, while the Lane Cove West Business Park around Mars Road and Sam Johnson Way holds factories and warehouses, and Figtree Plaza on Cullen Street covers local shops. Blackman Park runs along the Lane Cove River with walking tracks and sports facilities, and smaller reserves such as Cullen Street Reserve, Henley Reserve and Penrose Street Park fill gaps between the streets.
The river and those reserves keep bushland timber and damp soil near the residential boundaries, which is where colonies establish before moving through soil towards new construction. On the business park side, slabs are larger, perimeters longer and service runs heavier, and hardstand usually covers the surrounding ground soon after completion. Either way, the slab is tested at the same three places, penetrations, edge and joints, and those close before the concrete arrives or not properly at all.
Reviewed by Ismail, founder · Lower North Shore coverage · Updated September 2026 · More Lower North Shore suburbs
Get my fixed quote
Local conditions
Three conditions shape barrier work at Lane Cove West.
Blackman Park follows the river and smaller reserves sit between the streets, keeping timber and damp ground close to residential blocks, so perimeters run the full slab rather than selected faces.
Factory and warehouse pads have long perimeters and heavy service runs. Sequencing with the hydraulic contractor matters more on these jobs than anything else in the program.
Commercial sites are paved quickly after completion. Where hardstand will cover treated soil, a reticulation line is laid first so the zone can be recharged without breaking concrete.
What we install here
We install for replacement houses and secondary dwellings in the residential streets and for industrial pads in the business park. Homes get collars on every service, the specified under-slab component and a continuous perimeter as walls rise. Commercial slabs are planned with the hydraulic contractor, collared in one pass before the pour and finished around the perimeter ahead of hardstand. Every job is quoted as a single fixed price with stages listed and dates agreed with the site supervisor.
Local knowledge
Residential work sits near Hands Quarry Reserve and the streets around Cullen Street, with Blackman Park and the river a short distance west and Batten Reserve about 700 metres away. Commercial jobs run through the Mars Road and Sam Johnson Way precinct. Blocks closest to the river and reserve margins get the most thorough perimeter detailing, while business park pads are driven by service counts and program.
Lane Cove Council certifies building work at Lane Cove West, covering both the residential streets and the business park. Whatever the building type, the certifier needs the same evidence before the Occupation Certificate: a certificate setting out products, protected areas and the installing technician, plus a durable notice fixed permanently in the meter box with the installation date and recommended inspection frequency. Commercial clients usually take copies for their own records.
Lane Cove West at a glance
| Suburb | Lane Cove West, NSW 2066 |
|---|---|
| District | Lower North Shore |
| Distance from Sydney CBD | 8.2 km north-west |
| Certifying council | Lane Cove Council |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Lane Cove West questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215Where the structure contains primary building elements that termites can damage, a compliant system is required, and many warehouse and factory buildings do. We assess the design first, then price the system around the perimeter length and the number of services rather than treating it like a house slab.
It raises the priority of the perimeter. River and reserve country holds timber and damp soil that sustains established colonies close to the fence line, so the treated or shielded edge runs the full slab, junctions at any step-down are detailed, and we recommend reticulation where beds or paving will cover treated ground.
Yes. We coordinate with the hydraulic contractor so collars go on as services are set out, then complete the stage in one pass ahead of the pour inspection. Dates are locked with the site supervisor in advance, so the barrier work sits inside the program rather than interrupting the pour.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Lower North Shore.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
