Six decades of garden soil
Post-war blocks carry old fence posts, pergola footings and buried timber. That material can feed a colony before your pad exists, so the under-slab component matters as much as the treated edge.

Blacktown & Mount Druitt · AS 3660.1
Barrier work across Lalor Park 2147, where post-war housing on mature blocks near Freeman Street and Northcott Road is being rebuilt, split and extended.
Quick answer
A new dwelling at Lalor Park needs a termite management system under the NCC, installed to AS 3660.1. Collars go on every slab penetration before the pour, with the perimeter finished as walls rise. The City of Blacktown certifier requires the installation certificate and durable notice before the Occupation Certificate.
Termite barriers in Lalor Park
Lalor Park sits in the City of Blacktown about 28 km north-west of the city, built out under housing schemes between 1959 and the 1970s on land once part of Seven Hills. Its small outdoor shopping precinct at Northcott Road and Freeman Street now carries murals, and the library, community garden and skate park sit around the Freeman Street reserve. Because the housing stock is among the older in this part of Blacktown, most building work is rebuild work: knockdowns, granny flats behind existing houses and duplex development on the wider lots.
Sixty years of gardens sit under those rebuild sites. Established trees, old fences, pergola footings and buried timber all leave material in the soil that can support a colony long before a new pad is prepared, and any chemical treatment applied when these houses were built is well past its service life. A fresh slab is then tested at the usual three points, services passing through it, the exposed edge and the joints in the concrete. Those routes close only while the site is open, before the pour.
Reviewed by Ismail, founder · Blacktown & Mount Druitt coverage · Updated September 2026 · More Blacktown & Mount Druitt suburbs
Get my fixed quote
Local conditions
Three conditions shape barrier work on a Lalor Park block.
Post-war blocks carry old fence posts, pergola footings and buried timber. That material can feed a colony before your pad exists, so the under-slab component matters as much as the treated edge.
Courtneys Park and the Freeman Street reserve sit within a couple of hundred metres of most homes, keeping tree cover and leaf litter close to back fences and foraging pressure steady.
Granny flats behind existing houses need their own slab, collars and edge, and their own documentation. Where the main house has protection, the systems are joined if the detailing allows.
What we install here
Lalor Park jobs are mainly replacement houses, granny flats and duplex pairs. Waffle pod and raft slabs are the norm, so we collar every service, lay the under-slab component or apply the treated zone specified, then complete perimeter and cavity protection as the brickwork goes up. Where paving will follow soon after handover, reticulation keeps the treated zone serviceable. All of it sits in one fixed written quote, staged around your plumber and concreter.
Local knowledge
Work runs through the streets near Courtneys Park, about 200 metres from the centre, and out towards the Northcott Road shops and Seven Hills Plaza. The reserves threaded between the streets mean few blocks here sit far from established trees, so perimeters are run continuously and we flag any landscaping plan that would bury the inspection strip at the slab edge once the build is finished.
The City of Blacktown certifies building work at Lalor Park. Before the Occupation Certificate is issued, the certifier looks for a certificate recording the products installed, the areas protected and the licensed installer, together with a durable notice mounted permanently in the meter box showing the system, its installation date and the inspection interval recommended for the building. Product information is handed to the owner at the same time.
Lalor Park at a glance
| Suburb | Lalor Park, NSW 2147 |
|---|---|
| District | Blacktown & Mount Druitt |
| Distance from Sydney CBD | 28.4 km north-west |
| Certifying council | Sydney CBD Council |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Lalor Park questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215No. Treatments from the era when these houses were built have long passed their service life, and a new dwelling needs a current compliant system regardless of what was done before. Whether you are rebuilding or adding a granny flat at the rear, the new structure gets its own installation and its own certificate and durable notice.
Mainly in penetration count. Two dwellings on one slab means two sets of plumbing and conduit coming through the concrete, so collaring is the bulk of the work and drives the price more than floor area. Documentation is prepared so each dwelling can be certified separately when the pair is sold.
The slab plan, the slab type and a rough pour date, plus any engineering details if the block is being cut or retained. Because these are older lots with decades of garden soil, it also helps to know how much of the existing landscaping is being removed before the pad is prepared.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Blacktown & Mount Druitt.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
