Dense building on small lots
Tight sites leave limited room for a treated zone and restrict access for machinery, so the design leans on collars, the under-slab component and a carefully finished edge within the space available.

Eastern Suburbs · AS 3660.1
Barrier installation across Kingsford 2032, where medium and high density building continues along Anzac Parade and older side-street houses are replaced.
Quick answer
Building new at Kingsford requires a termite management system. The NCC calls for one in termite-prone areas, installed to AS 3660.1, with collars and under-slab protection fitted before concrete. Randwick certifiers need the installation certificate and the durable notice in hand before the Occupation Certificate is granted.
Termite barriers in Kingsford
Kingsford sits in the City of Randwick about 6.4 km south of the city, renamed in 1936 after Sir Charles Kingsford Smith. Anzac Parade runs through its centre as a dense strip of shops and restaurants ending at the Juniors Kingsford light rail terminus, and housing around it is mostly medium and high density. Older freestanding houses remain on the side streets, and those are the blocks where knockdown rebuilds, dual occupancies and secondary dwellings happen, while larger apartment slabs follow the main road corridor.
Building on tight urban lots concentrates the problem rather than removing it. A small footprint still carries a full run of services through the slab, boundaries sit close to neighbouring structures, and old side-street blocks come with decades of garden soil and buried timber underneath. Subterranean colonies test the same three weaknesses on every slab: penetrations, the exposed edge and construction joints. Sealing them happens before the pour, which is why the system is designed off the plans and staged with the builder.
Reviewed by Ismail, founder · Eastern Suburbs coverage · Updated September 2026 · More Eastern Suburbs suburbs
Get my fixed quote
Local conditions
Three Kingsford conditions shape the barrier work.
Tight sites leave limited room for a treated zone and restrict access for machinery, so the design leans on collars, the under-slab component and a carefully finished edge within the space available.
Where a new slab sits hard against an older neighbouring structure, the perimeter has to be detailed for that junction rather than assuming clear ground on all four sides.
Side-street rebuild blocks carry decades of beds and buried timber. That material can sustain a colony before construction starts, which raises the value of under-slab protection.
What we install here
Kingsford jobs range from replacement houses and dual occupancies on the side streets to apartment podium slabs along Anzac Parade. We collar every penetration, install the under-slab membrane or treated zone specified for the design, and complete perimeter and cavity protection as the structure rises. On constrained sites the access plan is agreed with the builder before we attend. Pricing is fixed from the plans with each stage listed, and visits are timed to protect the pour date.
Local knowledge
Residential work sits in the streets around Dacey Gardens, barely a hundred metres from the centre, with the bigger slabs along the Anzac Parade corridor itself. The Australian Golf Club and Royal Randwick Shopping Centre are each within a couple of kilometres, and large irrigated ground like the golf course keeps soil moisture high near its boundaries, which matters when a new slab edge is detailed on an adjoining block.
The City of Randwick is the certifying authority for Kingsford. Before signing an Occupation Certificate, your certifier wants evidence the termite management system exists: a certificate recording the products, the protected areas and the licensed installer, plus a permanent notice in the meter box that states the system, when it went in and how often the building should be inspected. Both are handed over with product information.
Kingsford at a glance
| Suburb | Kingsford, NSW 2032 |
|---|---|
| District | Eastern Suburbs |
| Distance from Sydney CBD | 6.4 km south |
| Certifying council | Anzac Parade Council |
| Standard applied | AS 3660.1 termite management systems |
| Installed | Before the slab pour, then staged through the build |
| Documents supplied | Installation certificate and durable notice |
| Typical builds covered | New homes, knockdown rebuilds, granny flats, duplexes, townhouses |
Systems we install
Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.
01A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.
02A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.
03Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.
04An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.
05Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.
06Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.
Why during construction
A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.
A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.
New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.
Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.
An under-slab system covers ground that no treatment from outside the finished house can ever reach.
Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.
Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.
Installation stages
A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.
Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.
Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.
Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.
Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.
A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.
The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.
Compare systems
Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.
Physical protection
Entry-point protection
Soil protection
Top-up protection
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
For builders & developers
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
A complete document set for the builder, the certifier and every future owner of the property.
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
Membrane barrier across a large residential slab
Barrier work on a Sydney Harbour site
Installation through sandstone excavation
Perimeter barrier and sleeves on a new slab
Waffle pod formwork with collared penetrations
Membrane detailed against a retaining wall
Membrane sealed around a column
Protected slab edge with collar in place
Collared penetrations before the pour
Perimeter barrier on a completed slab edge
Pipe penetrations sealed into the membrane
Collars fixed through mesh before concreting
Google reviews
Real, verified reviews from homeowners and businesses we've worked with.
Pricing
Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.
After handover
A barrier only works while it stays intact and visible. Pass these on to the owner.
Free fixed quote
Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.
Get a fixed quote
Kingsford questions
Still unsure? Call and talk it through with a licensed technician.
+61 450 515 215Yes, though the method adapts to the site. Narrow lots restrict the width available for a treated zone and limit machinery access, so the system relies more on collars at every penetration, the under-slab component and a carefully detailed edge. We review boundary clearances with your builder before quoting so nothing is assumed.
Where the building contains primary elements termites can damage, yes, and the scale simply changes the planning. Podium slabs carry a large number of hydraulic penetrations, so collaring is coordinated with the hydraulic contractor and completed in one pass ahead of the pour, with documentation prepared for the whole development.
The slab plan and any engineering details for retaining or step-downs, plus a rough pour date. Old side-street blocks often have decades of garden soil and buried timber below the new pad, so seeing the design early lets us decide how much weight the under-slab component should carry before the site is cleared.
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
Same crew, same staging and the same certifier-ready paperwork, right across the Eastern Suburbs.
Service areas
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.
Slab pour coming up?
Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.
