Perimeter termite barrier on a completed slab edge

Inner West · AS 3660.1

Pre-Construction Termite Barriers Drummoyne

Collars, membrane and perimeter protection go into Drummoyne's river peninsula blocks in postcode 2047, from the Iron Cove Bridge to the shopping strip on Victoria Road.

Postcode2047
DistrictInner West
From the CBD5.3 km west

Quick answer

Drummoyne new builds, from townhouses to apartment blocks to knockdown rebuilds, do need a termite management system, because the peninsula falls within termite-prone Sydney and the National Construction Code applies to every new dwelling. Collars go around each penetration before the concrete pour, and the certifier will want an installation certificate plus a meter-box durable notice on file before they sign the Occupation Certificate.

Termite barriers in Drummoyne

Why Drummoyne builds need the barrier in before the pour

Drummoyne occupies a peninsula between Iron Cove and Five Dock Bay, surrounded on three sides by the Parramatta River, about 5.3 km west of the CBD in postcode 2047 and the administrative centre of the City of Canada Bay. Victoria Road runs the length of the suburb, with the Gladesville Bridge to the north and the Iron Cove Bridge to the east, and Birkenhead Point Outlet Centre anchors retail alongside a shopping strip along Victoria Road and Lyons Road. Housing ranges from older homes and waterfront properties to a large number of apartment buildings, and with little vacant land left, new work is mostly knockdown rebuilds, apartment redevelopment and boutique townhouse infill. All of it still triggers the same requirement, a compliant termite management system fitted before the concrete goes down.

Water on three sides is what shapes ground conditions across Drummoyne. Waterfront gardens and sloping blocks running down toward Iron Cove or Five Dock Bay stay damp well after rain, and foreshore areas along the Parramatta River Regional Park hold moisture close to the surface for long stretches. That dampness reaches into the soil under a new slab on riverside blocks, giving subterranean termites an easier path in from a neighbouring garden or the foreshore itself. Apartment buildings along the water and along Victoria Road often share basements and car parks, and a single new development can easily rack up dozens of pipe penetrations, every one of which has to be collared and logged on its own.

Reviewed by Ismail, founder · Inner West coverage · Updated September 2026 · More Inner West suburbs

Get my fixed quote
Barrier membrane and mesh installed before the pour
Barrier membrane and mesh installed before the pour — one of our own Inner West installations.

Local conditions

What makes Drummoyne blocks a termite risk

Three things about Drummoyne's peninsula setting change how a termite barrier gets planned and installed.

River moisture on three sides

With Iron Cove, Five Dock Bay and the Parramatta River surrounding much of the suburb, waterfront and near-waterfront gardens stay damp for long stretches after rain. New slabs on these blocks get a full perimeter, with careful attention to drainage so water is not channelled along the barrier line.

Dense apartment redevelopment

Apartment buildings along the water and Victoria Road often share basements, car parks and service risers, so a single development can carry dozens of plumbing penetrations. Every one of those gets checked off against the plumber's rough-in plan before we sign off, because a missed collar on a large building is an expensive fix once the concrete has cured.

Knockdown rebuilds on older blocks

Drummoyne's older housing stock means a lot of our work is knockdown rebuilds on established blocks with decades of garden growth. Leftover stumps or buried timber from the previous structure are exactly the kind of food source that lets a colony establish itself before the new slab is even poured, so we check for it before quoting.

What we install here

Building in Drummoyne

Drummoyne work covers knockdown rebuilds on the suburb's established house blocks, apartment redevelopment near the water and along Victoria Road, and boutique townhouse infill where a larger block allows it. Waffle pod and raft slabs are common on level sites, while waterfront blocks running down toward Iron Cove or Five Dock Bay more often need suspended floors or piers. The job is costed once, upfront, straight from your plans, and we coordinate closely with the builder, given how many Drummoyne sites sit on busy roads or tight riverside access.

  • Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
  • Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
  • Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
  • Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
  • ReticulationA pipe network laid before paving so the treated zone can be topped up later.
  • Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.

Local knowledge

Around Drummoyne

Drummoyne Park, about 0.4 km from the suburb centre, adds garden beds and shaded ground to blocks nearby, while Birkenhead Point Outlet Centre, about 0.8 km away, anchors the retail side of the peninsula. Woolwich Baths Beach, about 2.0 km away across the river, and the Parramatta River Regional Park mark the wider waterway that wraps around three sides of Drummoyne. Blocks closest to the foreshore and the regional parkland get the fullest attention to perimeter and drainage, given how persistently damp riverside ground here tends to be.

The City of Canada Bay, headquartered in Drummoyne, handles certification here. Before the Occupation Certificate is signed, their certifiers want an installation certificate covering the products, the protected areas and the licensed installer, plus a durable notice fixed inside the meter box. On larger Drummoyne apartment developments we break the certificate down by building and penetration count, giving strata and building certifiers a clear record without back and forth.

Slab date locked in?Tell us the pour date and we will book the stages around your builder.

Drummoyne at a glance

Termite barrier facts for Drummoyne

SuburbDrummoyne, NSW 2047
DistrictInner West
Distance from Sydney CBD5.3 km west
Certifying councilLocal council
Standard appliedAS 3660.1 termite management systems
InstalledBefore the slab pour, then staged through the build
Documents suppliedInstallation certificate and durable notice
Typical builds coveredNew homes, knockdown rebuilds, granny flats, duplexes, townhouses

Systems we install

The right barrier for your slab and your site

Every photo below is from one of our own Sydney jobs. We look at your slab design, site and budget, then recommend a system or a combination.

Physical termite barrier laid over the slab preparation01

Under-slab membrane

A termite-resistant sheet laid over the whole prepared footprint before concreting, so termites can't come up through the slab anywhere.

Penetration collars fixed through mesh before concreting02

Penetration collars

A sealed collar on every pipe, conduit and service that passes through the slab. These gaps are the most common hidden way in.

Completed slab with a perimeter termite barrier in place03

Slab edge & cavity barrier

Protection at the slab edge and into the wall cavity, which stops termites building hidden tunnels up the outside of the slab.

Chemical soil barrier applied along a brick footing04

Chemical soil barrier & reticulation

An APVMA-registered termiticide zone in the soil, with an optional pipe network under paving so it can be recharged later without digging.

Termite barrier beneath a suspended timber floor05

Suspended floors & piers

Barriers for bearers, piers and raised timber floors on sloping or elevated blocks, where there's no slab to protect.

Perimeter barrier run against a sandstone wall06

Retaining walls & tricky sites

Detailing for sandstone cuts, block retaining walls, step-downs and cut-and-fill sites, which are common across Sydney.

Why during construction

Do it now, or pay more to do less later

A retrofit can only treat around a finished house. A pre-construction system protects the parts nobody will ever be able to reach again.

Costs far less

A barrier put in during the build costs a fraction of a post-construction system, and far less than repairing termite damage.

Meets the NCC

New houses (Class 1) and outbuildings (Class 10) with termite-susceptible framing need a compliant termite management system.

Hidden gaps sealed

Pipe penetrations and slab joints can only be fully protected while they're still open, before the concrete goes in.

The whole footprint

An under-slab system covers ground that no treatment from outside the finished house can ever reach.

No OC delays

Your certifier needs the certificate and durable notice before issuing the Occupation Certificate. We supply both together.

Easier to sell

Documented, compliant protection gives buyers, building inspectors and lenders confidence when the home is sold.

Installation stages

Installed in stages that follow your build

A termite barrier isn't a single visit. Each part goes in when the site is ready for it, and we fit around your plumber, concreter and bricklayer.

Waterfront building site ready for pre-construction termite protection
Step 01Design / DA

Plans & fixed quote

Send your plans and slab details. We recommend a system and give you one fixed price that covers every stage.

Service penetration collars set out through the reinforcement mesh
Step 02Before the pour

Collars & under-slab

Collars go on every service once the plumber has set out, then the membrane or soil treatment is installed across the prepared site.

Perimeter barrier in place as framing begins
Step 03Walls going up

Slab edge & cavity

Perimeter and cavity protection is fitted as the brickwork or cladding goes up, so there's no unprotected gap at the slab edge.

Perimeter barrier on a new build in a Sydney estate
Step 04Before landscaping

Final perimeter

Where it's specified, the chemical perimeter or reticulation system is completed around the building before paths and gardens go in.

Barrier membrane visible along a finished slab edge
Step 05Pre-OC

Notice & certificate

A durable notice goes in the meter box, and the installation certificate goes to your builder and certifier.

Finished slab with a continuous perimeter barrier
Step 06Handover

Owner advice

The owner gets simple care instructions and an inspection schedule so the system keeps doing its job for years.

Compare systems

Physical or chemical termite barrier?

Both can meet AS 3660.1. The best choice depends on your slab type, what surrounds the house and how much ongoing upkeep the owner wants.

Physical protection

Physical membrane, mesh or graded stone

No chemicals
  • How it worksA layer termites can't chew through, laid under the slab or around its edge.
  • Life & upkeepDesigned to last as long as the slab while it isn't disturbed. No top-ups.
  • Good fit forSlab-on-ground homes, and owners who prefer a non-chemical option.
Get this quoted Natural, lasting defence

Entry-point protection

Penetration collars

  • How it worksCollars sealed around each pipe and conduit that passes through the slab.
  • Life & upkeepLong-lasting when fitted properly before concreting.
  • Good fit forEvery slab, usually paired with a perimeter system.
Get this quoted Small detail, big difference

Soil protection

Chemical soil barrier

  • How it worksA treated zone of termiticide in the soil under and around the building.
  • Life & upkeepDepends on the product label and soil conditions. Can be re-applied.
  • Good fit forTighter budgets and some complex sites.
Get this quoted Flexible and provable

Top-up protection

Reticulation system

Rechargeable
  • How it worksPipes laid before paving so termiticide can be pumped back into the soil.
  • Life & upkeepCan be recharged for the life of the building without lifting paths.
  • Good fit forHomes that will be surrounded by paving or landscaping.
Get this quoted Protection you can renew

Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.

Our technician installing a pre-construction termite barrier
Our technician installing a perimeter barrier on a live Sydney site.

For builders & developers

Built around your program, not ours

Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.

What we need to quote

Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details

Fitting in with your trades

  • Collars in before the pour inspection
  • Slab edge & cavity as walls go up
  • Perimeter done before paving

Multi-unit & repeat work

Consistent pricing across lots, one point of contact and a full document set for every dwelling.

No certification delays

Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.

Paperwork

Everything you get at handover

A complete document set for the builder, the certifier and every future owner of the property.

Durable notice

A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.

For: certifier, owner, future owners

Installation certificate

Written confirmation of the system and products used, the areas protected and our licence details.

For: builder, certifier, owner

Product information

Details of the physical system or termiticide installed, including safety data sheets for any chemicals.

For: builder, owner

Care & inspection advice

How to keep the system working, plus the recommended inspection frequency under AS 3660.2.

For: homeowner

Google reviews

What Sydney clients say about us

Real, verified reviews from homeowners and businesses we've worked with.

5.0
Read our reviews on Google
View

Pricing

What sets the price of a barrier

Every build is different, so we don't guess. We price from your plans and give you one fixed written quote. Quoting is free.

  • 01
    Slab area & perimeterBigger footprints need more material, more edge protection and more labour.
  • 02
    System typeFull under-slab, perimeter-only, chemical and reticulation options are all priced differently.
  • 03
    Number of penetrationsEach plumbing and electrical service through the slab needs its own collar.
  • 04
    Site complexityRetaining walls, step-downs, sandstone and suspended floors add detailing.
  • 05
    Number of visitsStaged installs follow your program. Multi-dwelling sites can often be combined.
  • 06
    Site accessTight blocks, steep driveways and limited street frontage slow the set-out and add time on site.
Get my fixed quote

After handover

Keeping the barrier working

A barrier only works while it stays intact and visible. Pass these on to the owner.

  • Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
  • No garden beds or stacked timber against the house
  • Keep weep holes clear of render and debris
  • Fix leaking taps, downpipes and hot water units near the walls
  • Ask the installer before drilling through the slab or adding pipes
  • Book a timber pest inspection at least every 12 months
75 mm EXPOSED EDGE BARRIER UNDER THE SLAB
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspection Handed over recently? We inspect the barrier and the building every 12 months.

Free fixed quote

Protect your build
before the pour

Tell us about your build and get a clear, fixed price, fast. We usually reply within 30 minutes during business hours.

  • Send your detailsBuild type, suburb and rough slab pour date.
  • Share your plansSlab plan or architectural drawings, plus any retaining wall details.
  • Get your fixed quoteOne written price covering every installation stage.
Prefer to talk it through?+61 450 515 215 We're here to help 7 days, 7am to 9pm.
  • Fast responseWithin 30 mins
  • Licensed expertsQualified & insured
  • Trusted locallyAcross Sydney

Get a fixed quote

Tell us about your build

Usually reply
within 30 minutes
Plans (optional)
0/1200

Your details are safe with us. We never share your information.

Drummoyne questions

Answered

Still unsure? Call and talk it through with a licensed technician.

+61 450 515 215
Does an apartment development in Drummoyne need a termite barrier before occupation?

Yes. Scale is the only real difference between an apartment block and a house when it comes to termite protection, since both need a compliant system installed before occupation is approved. Drummoyne developments typically bring far more penetrations through shared basements and service areas than a single house would, and every one is logged individually on the installation certificate handed to the certifier.

Do waterfront blocks in Drummoyne need extra termite protection?

Blocks running down toward Iron Cove, Five Dock Bay or the Parramatta River tend to have more persistently damp ground, so we generally recommend both physical and chemical protection across the whole perimeter line, not a partial one. We also check that stormwater and site drainage direct water away from the barrier line, which matters more on a sloping riverside block.

Can a knockdown rebuild in Drummoyne reuse an old termite barrier?

No, a new slab needs its own termite management system regardless of what protection the previous house had, since demolition removes the old structure the system was built around. We check the site for leftover material from the old house first, then install collars and the perimeter fresh before the new concrete is poured.

Does a new home need a termite barrier in NSW?

In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.

What does a pre-construction barrier cost?

It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.

Nearby

We also install barriers around Drummoyne

Same crew, same staging and the same certifier-ready paperwork, right across the Inner West.

Service areas

Termite barriers across 379 Sydney suburbs

From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.

Slab pour coming up?

Lock in your termite barrier before the concrete truck arrives

Send us your plans today for a fixed quote, or call and talk to a licensed technician about your site.

Termite barrier work on a Sydney Harbour building site