Termite barriers fitted before the pour on Como rebuilds sloping toward the Georges River, on the streets that backed onto bushland during the 1994 Como West bushfires.
A Como rebuild does need its own termite management system, yes, sign-off from Sutherland Shire depends on it. Sitting between the Georges and Woronora rivers puts the suburb in termite country, so the work has to follow AS 3660.1: collars in, perimeter closed, all before the slab goes down. Once that is finished we put together the meter box notice and installer's paperwork the shire will want to see.
Termite barriers in Como
Why Como builds need the barrier in before the pour
Como sits on the southern bank of the Georges River in postcode 2226, about 20.2 km south-west of the Sydney CBD, with the Woronora River forming its western edge, within the Sutherland Shire. The suburb is known for its railway bridge, the original single-track bridge from the 1880s now carries walkers and cyclists, while trains use a newer concrete bridge beside it, and Como station, the Como Hotel and the Como Pleasure Grounds by the river are local landmarks. Most homes are separate houses, and new building work is mostly a rebuild on one of these established, often sloping blocks, since there is little vacant land left. Whatever the scale, Sutherland Shire will not sign off without a compliant termite system in the ground first.
Como West was badly hit by bushfires in 1994, a reminder of how close the bush sits to many of these blocks. For a termite barrier, the combination of river foreshore and bushland means the risk comes from two directions at once. Blocks running down toward the water hold moisture in the soil, which suits subterranean termites, while blocks backing onto bushland face termites, along with spiders and possums, foraging in from established scrub. Because Como's streets are often sloping, the sub-floor, the piers and any retaining wall matter just as much as the visible slab edge when we plan out a barrier here.
Completed slab with a perimeter termite barrier in place — one of our own Sutherland Shire installations.
Local conditions
What makes Como blocks a termite risk
Three features of Como's setting between the river and the bush shape how a barrier is planned.
Sloping blocks toward the river
Many Como blocks run down toward the Georges or Woronora rivers, and that lower ground holds moisture in the soil for longer than a block on flat, elevated land. Piers, suspended floors and slab edges on these blocks all need careful protection.
Bushland edges since the 1994 fires
Como West's history with bushfire is a reminder of how close established bushland sits to many blocks here. That same bush supports termite colonies that forage toward the nearest structure, so a full perimeter is usually the right call on the bush-facing side.
Rail corridor and older housing stock
Como station and the rail line run close to houses on several streets, and the older housing stock nearby often has established gardens that can already be sheltering termite activity. A rebuild next to that kind of block needs the barrier checked against what is already there.
What we install here
Building in Como
Como work is mostly rebuilds on established, often sloping blocks between the river and the surrounding bushland. Where a block drops toward the water we generally end up detailing piers and a suspended floor rather than a simple slab, and the higher, flatter sections closer to the shops still take a standard waffle pod. Booking follows the builder's own program, plumber's rough-in first, then our visit, then the pour, and sloping sites get extra time allowed for sub-floor access. One fixed written quote covers the whole job.
Under-slab membraneA termite-resistant sheet laid across the prepared ground before the pour.
Penetration collarsCollars sealed to every pipe and conduit that comes up through the slab.
Perimeter & slab edgeA barrier at the slab edge and into the cavity, so nothing can track up hidden.
Chemical soil barrierAn APVMA-registered treated zone in the soil under and around the building.
ReticulationA pipe network laid before paving so the treated zone can be topped up later.
Piers & suspended floorsProtection for bearers, piers and suspended timber floors on sloping blocks.
Local knowledge
Around Como
Henry Lawson Reserve, close to the centre of the suburb, keeps its trees and leaf litter shelter for ants, spiders and rodents near nearby homes, and Como station, a rail corridor running close to several streets, is a route rats commonly use. Ninth Avenue Reserve, further out, is part of the wider bushland where termites and funnel-web spiders live and forage toward nearby blocks, so properties closer to that reserve generally get a more thorough perimeter than streets nearer the station.
Sutherland Shire is the certifying body for Como, and it holds off on the Occupation Certificate until two items land on file: a notice inside the meter box naming what termite system protects the house, and a certificate from the installer spelling out the products, the areas covered and the licence they worked under. Where a block sits on a slope with piers or a suspended floor, that detail goes on the paperwork too, matched against the engineering drawings.
4 neighbouring suburbs covered by the same crew
Slab date locked in?Tell us the pour date and we will book the stages around your builder.
Most of the Sydney builds we work on use a combination: physical collars on every penetration plus a physical or chemical perimeter.
Our technician installing a perimeter barrier on a live Sydney site.
For builders & developers
Built around your program, not ours
Builders, developers and owner-builders get a fixed quote from plans, a technician who turns up when the site is ready, and paperwork that never holds up sign-off.
What we need to quote
Architectural or slab planSlab type: raft, waffle pod or suspendedSite addressRough pour dateRetaining wall & step-down details
Fitting in with your trades
Collars in before the pour inspection
Slab edge & cavity as walls go up
Perimeter done before paving
Multi-unit & repeat work
Consistent pricing across lots, one point of contact and a full document set for every dwelling.
No certification delays
Missing durable notices and unclear install records are a common reason Occupation Certificates get held up. We hand everything over together so your certifier has it all in one go.
Paperwork
Everything you get at handover
A complete document set for the builder, the certifier and every future owner of the property.
Durable notice
A permanent notice in the meter box showing the system, install date, installer, any chemical's life expectancy and inspection advice.
For: certifier, owner, future owners
Installation certificate
Written confirmation of the system and products used, the areas protected and our licence details.
For: builder, certifier, owner
Product information
Details of the physical system or termiticide installed, including safety data sheets for any chemicals.
For: builder, owner
Care & inspection advice
How to keep the system working, plus the recommended inspection frequency under AS 3660.2.
For: homeowner
From real jobs
Recent termite barrier installations
Photos from our own Sydney sites, not stock images. Tap any photo to see it larger.
A barrier only works while it stays intact and visible. Pass these on to the owner.
Keep at least 75 mm of the slab edge exposed. Don't cover it with soil, mulch or paving.
No garden beds or stacked timber against the house
Keep weep holes clear of render and debris
Fix leaking taps, downpipes and hot water units near the walls
Ask the installer before drilling through the slab or adding pipes
Book a timber pest inspection at least every 12 months
The inspection zone. An exposed strip of slab edge lets anyone spot termite mud tubes before they reach the frame, which is why paving, soil and mulch must stay below it.
Annual timber pest inspectionHanded over recently? We inspect the barrier and the building every 12 months.
Do Como blocks near the Georges River need extra termite protection?
Blocks running down toward the Georges or Woronora rivers tend to hold more moisture in the ground than higher, flatter sections of the suburb, and that dampness suits subterranean termites working toward a structure. We generally recommend a physical barrier at the slab edge and around any piers on these blocks, rather than relying on soil treatment in consistently damp ground.
Does the 1994 bushfire history affect Como's termite risk?
The fire itself does not change today's termite risk, but Como West's history is a reminder of how close established bushland sits to many blocks in this part of the suburb. That bush supports termite colonies that forage toward the nearest structure, so blocks on the bush-facing side of Como typically need a more thorough perimeter than blocks further from the reserve.
Can you protect a sloping Como block with a suspended floor?
Yes. Where the block falls toward the river and the house sits up on piers, the bearers, piers and floor timbers become the main thing we are protecting, not a slab edge, because there often isn't one. The system is still built to AS 3660.1, and Sutherland Shire still gets the same paperwork, just describing pier and bearer protection instead of a perimeter run.
Does a new home need a termite barrier in NSW?
In most cases, yes. The National Construction Code requires a termite management system for new houses and outbuildings in termite-prone areas where the primary building elements can be damaged by termites. Sydney is termite-prone, so the system is installed to AS 3660.1 and your certifier asks for the installation certificate and durable notice before the Occupation Certificate is issued.
What does a pre-construction barrier cost?
It depends on slab area, perimeter length, the number of pipe penetrations, the system chosen, site complexity and how many visits the build needs. Send us the plans and we return one fixed written quote covering every stage. Quoting is free.
Nearby
We also install barriers around Como
Same crew, same staging and the same certifier-ready paperwork, right across the Sutherland Shire.
From the Eastern Suburbs and Inner West to the Hills, the Shire and the western growth corridors. Every suburb has its own page with the local ground conditions, the council that certifies the work and the questions builders there ask us.